Estimator/Change Order Specialist
Company: Paxon Energy & Infrastructure Services LLC
Location: San Diego
Posted on: May 7, 2025
Job Description:
-Estimator/Change Order SpecialistCOMPANY DESCRIPTION: -Paxon
Energy, the leading force in the energy industry and 9th fastest
growing company in the U.S., is driven by our unwavering commitment
to sustainable solutions and exceptional services. With a
collaborative and inclusive culture, Paxon fosters personal and
professional growth, empowering individuals to be innovative and
make a meaningful impact in shaping the future of energy as well as
unlocking their full potential contributing to transformative
projects and working alongside industry experts. Join Paxon and
become part of a dynamic team dedicated to driving positive change
in the world. -JOB TYPE: -This will be a mid-term position for
20-40 weeks with a potential to become a full-time position. "This
job is contingent upon contract award. We are positioned for
imminent award and are gearing up for dynamic project execution."
-LOCATION: -San Diego, CA - On site. Expect to be working out of a
job site trailer for the duration of this project. -COMPENSATION:
-$100k - $130k Salary; Exempt. Note: This is a starting point and
may differ based on the successful candidates' interview and years
of experience. -POSITION SUMMARY: -As the Estimator/ Change Order
Specialist, you will be responsible for the direction and
preparation of lump sum, unit rate and cost-plus industrial
construction cost estimates ranging from simple cost analysis to
definitive estimates in support of proposals, project controls,
prime contractor and subcontractor submittals and project change
orders. You will be working at an advanced Water Treatment Facility
under the San Diego Pure Water Program. -What you will be
responsible for: -(Disclaimer: The lists below are not all
inclusive)
- Review contractual documents (specifications, ECN's, contractor
RFI's) and determine contract modifications scope changes and their
applicable cost.
- Prepare clear detailed quantity takeoffs for specified scopes
of work to assist Construction Manager, CM Advisor and Team
members.
- Prepare estimate details and summary using estimating software;
tabulating materials, process equipment, construction equipment,
labor, OH&P
- Obtain commercially available cost pricing from vendors,
manufacturers, suppliers, and trade representatives. -
- Ability to work under a variety of timelines, establishing
priorities to meet project deadlines.
- Advanced ability to interpret Project Specifications with
multiple Code references. -
- Calculate the cost of a TIA within base contract and congruent
contract changes orders.
- Review Contractor and Subcontractor change order cost
proposals.
- Assist in negotiation of change order costs. -What you will be
responsible for: -(Continued)
- Provides technical advice and assistance to the Field
Construction Manager, Deputy CM and CM Advisors in the preparation
of all levels of estimates ranging in scope and complexity from a
simple factored or curve type analysis estimate to extremely
complex mechanical and electrical changes.QUALIFICATIONS: - -You
must have the following: (Minimum) -
- Minimum 8 years of experience in cost accounting and scheduling
in water management, 5 years of direct or relevant experience
without a bachelor's degree.
- Pass a background check, drug screen, motor vehicles records
search. -If you have the following it would be a big plus:
-(Preferred) -
- BS or MS graduate in Construction Management or related field.
-
- Preferred Skills:
- Complex estimating principles and practices including
conceptual estimating. -
- Cost engineering.
- Mathematical, Consulting, Planning, Analytics.
- Interpret and understand specifications and contracts.
- Software Skills: Ranging from Microsoft Office Suite to PMIS
Procore to Estimating Timberline or similar. -
- Advanced verbal and written communication and interpersonal
communication skills. -
- Preferred Accreditations, one of the following: -
- AACE International -
- CCP (Certified Cost Professional)
- CEP (Certified Estimating Professional)
- American Society of Professional Estimators CPE (Certified
Professional Estimator) - -
- Preferred Database Experience, one of the following: -
- RS Means
- Richardson Cost Data
- NECA Labor Units
- MCAA Labor Calculator -If you have the following it would be a
big plus: -(Continued) - -
- Preferred Estimating Experience in Facility Electrical Service
discipline plus any of the following:
- Instrumentation and Control
- Heavy Mechanical and Process Piping
- Facility Civil/Structural - -BENEFITS: -Paxon offers a
comprehensive package of Medical, Dental, Vision, 401K, Life
Insurance, and many more! -We are committed to providing a
diversified workforce for our clients:Paxon Energy & Infrastructure
is committed to creating a diverse environment and is proud to be
an Equal Opportunity Employer. We invite resumes from all
interested parties including women, minorities, veterans, and
persons with disabilities. All qualified applicants will receive
consideration for employment without regard to their protected
veteran status and will not be discriminated against based on
disability. -Compensation details: 100000-130000 Yearly
SalaryPI9075fc4da0ec-37820-37431359
Keywords: Paxon Energy & Infrastructure Services LLC, Cathedral City , Estimator/Change Order Specialist, Professions , San Diego, California
Didn't find what you're looking for? Search again!
Loading more jobs...